Loading...
HomeMy WebLinkAbout01.09.2024 AMI Project Begins City of Plainview NEWS th 202 W. 5 Street Plainview, TX 79072 January 10, 2024 Contractors Begin Work on AMI Project, Meter Installation Contractors for the City of Plainview have begun installation of more than seven thousand residential meters around town for the Automatic Water Meter project. Installation will be completed during the week between 7:00 a.m. and 7:00 p.m., and each meter installation is expected to take about 30 minutes. During this time, the water will be shut off. Before they begin, contractors will knock on the door to notify residents. If a resident is not home, contractors will check to ensure there is no water running and then begin the installation process. Meters are in accessible areas for contractors; they will not need to enter a residence for any portion of this project. Once completed, contractors will leave a door hanger on your door notifying the residence that the meter was installed and the lines were flushed. The door hanger will also indicate if they are unable to complete the installation or need the resident to flush the lines with instructions. Contractors will be identifiable with safety vests and vehicles with the company name and logo - Pedal Valve or Ameresco. The AMI Project (Advanced Metering Infrastructure) Project Upgrade will allow residents access to more frequent and detailed information about water usage, better control of resident water usage and monthly bills. For a video detailing the process or more information, visit www.plainviewtx.org and click on Plainview is WaterWise graphic. ### Photo: Meters in storage ready for installation.