HomeMy WebLinkAbout11.12.2021 24th Street Construction Phase 2
City of Plainview NEWS
901 Broadway St.
Plainview, TX 79072
November 12, 2021
th
24 Street Phase 2 Construction
th
Begins on Southside of 24
Street; Traffic Flow Changes
Direction
th
Phase 2 of the 24 Street Construction Project has
begun on the southside of the street. The south
lanes are now closed and traffic will travel westbound
in the north lane.
th
Traffic will continue to be diverted to 16 Street or
Industrial Boulevard to ensure the safety of
contractors, passengers, residents and to allow
better access for police and fire/EMS vehicles.
th
Driveways along 24 Street will remain open as
much as possible throughout the project, but there
will be times that access will be limited.
th
The 24 Street Construction Project, encompassing the
area from Columbia Street to Dimmitt Road is
scheduled for completion Spring 2022.
###