Loading...
HomeMy WebLinkAbout11.12.2021 24th Street Construction Phase 2 City of Plainview NEWS 901 Broadway St. Plainview, TX 79072 November 12, 2021 th 24 Street Phase 2 Construction th Begins on Southside of 24 Street; Traffic Flow Changes Direction th Phase 2 of the 24 Street Construction Project has begun on the southside of the street. The south lanes are now closed and traffic will travel westbound in the north lane. th Traffic will continue to be diverted to 16 Street or Industrial Boulevard to ensure the safety of contractors, passengers, residents and to allow better access for police and fire/EMS vehicles. th Driveways along 24 Street will remain open as much as possible throughout the project, but there will be times that access will be limited. th The 24 Street Construction Project, encompassing the area from Columbia Street to Dimmitt Road is scheduled for completion Spring 2022. ###