Loading...
HomeMy WebLinkAbout7.24.2020 Water Line Construction City of Plainview NEWS 901 Broadway St. Plainview, TX 79072 July 24, 2020 City of Plainview’s Water Distribution/Collection Department to Repair Water Lines in Yonkers th Street & 7 Street Areas The City of Plainview’s Water Distribution/Collection Department will begin the first phase of main water line replacements to improve the th water distribution system. During this phase, Yonkers Street from 6 thth Street to 7 Street will be closed beginning on Monday, July 27. The street is scheduled to be blocked on Monday and reopened at the end of the day. If unforeseen circumstances arise, the street will be th closed through Tuesday, July 28. th The second phase of the project will include 7 Street, Yonkers, Vernon, Xenia and Wayland Streets. This project th will begin on Monday, July 27 and is estimated to be completed in September. Certain streets and areas will be closed during this time. Please avoid this area if possible and use caution if in the area. The project includes disinfecting and flushing of the new pipes, transferring water service connections from old to new water mains, removing and replacing damaged concrete sidewalks and curbs and restoring areas disturbed during construction. “We understand this will be an inconvenience for residents in the area,” says Paul Kite, Assistant Director of Water Utilities. “We appreciate their cooperation during this project.” For more information, contact the City of Plainview’s Water Department at 296.1100. ###